Expert Sales Team Dedicated to your needs
Award Winning Products Direct from the Manufacturer
Next Day Delivery Available on Most Products

Sliding Track kit (3 mtr)

£469.94
In stock
SKU
SLIDEKIT_3

Large stocks available : For guaranteed fast delivery

For more versatile applications, look no further than our most popular system, the Sliding Door Track Kit. This system can be opened and closed to allow easy access

Kit contains - 3 metres runner, 6 metres of sliding track, pull cord, stops and joiners.

Height

Measure structural opening height in millimetres.

Width

Measure structural opening width in millimetres.

Maximum overlap

(80% - 100%)

Curtain will be heavier, will hang better and provide a better barrier but will cost a little more.

Minimum overlap

(40% - 56%)

Curtain will be lighter weight and not so heavy duty, but will cost less.

Marker

Red marker edge warning strips are a safety feature designed to highlight the edges of the doorway to forklift drivers. Red marker Edge strips are not essential but they are a nice health & safety feature and they look great on a new curtain.

Strip Type

For curtains less than 3m high the 200mm PVC is normally ok. For 3m to 5m high curtains we recommend the 300mm PVC and for curtains over 5m high you should select 400mm PVC. For more detailed information about our PVC range please contact us.

Fixed Curtain Track

Each PVC strip is bolted onto a fixed track for additional support in heavy duty applications.

Hook-on Track

The standard PVC strip curtain track, this allows each strip to be easily hung with a hook on clamp, allowing easy installation and replacement. 

Sliding Curtain Track

The entire curtain slides to one side when opened. Be sure to keep the full structural width of the track clear on one side to allow the curtain to fully retract.

Under Lintel

For under lintel fixing, the strips will fill the structural opening only with the track being installed to the underside of the lintel.

Face Fixing

For face fixing, the track is mounted above the structural opening and the PVC strips will overlap the sides of the opening. 

 

Please note that you only need to provide the full structural opening measurements, and our configurator will make any neccessary adjustments needed for either fixing option. No manual calculations needed! 

Clamp Required

Clamps are used on hook type suspension systems, It help in mounting the PVC strip onto the rail.

Strip Size

Light Duty – Suitable for Pedestrian traffic.
200mm x 1mm to 2.7mm
300mm x 2mm

Medium Duty - Suitable for warehouse traffic / forklift.
300mm x 2mm to 3mm
400mm x 2.5mm

Heavy Duty – Suitable for Motorised warehouse traffic.
400mm x 3mm to 4mm

£469.94

Description

Specifications

Reviews

Delivery & Returns

Questions & Answers

Description

For more versatile applications, look no further than our most popular system, the Sliding Door Track Kit. This system can be opened and closed to allow easy access through.

Kit contains - 3 metres runner, 6 metres of sliding track, pull cord, stops and joiners.

Specifications

Product Name Sliding Track kit (3 mtr)
Strip Type Solid White

Reviews

Delivery & Returns

Delivery

Deliveries are typically made using pallet carriers. The carrier will deliver your goods to the destination you specify when placing your order. We will inform you of the expected delivery date and time for your order before despatch. Please make sure that your goods inwards department is aware of the delivery.

Note: Invoices are sent when goods are shipped. Proof of delivery is available either via your Kenfield online customer portal or by contacting the sales team at sales@kenfield.com 

Returns

Returns are handled by our Quality Manager in accordance with our ISO9001 quality management processes. Returned items are receipted, quarantined and inspected before a report is completed to determine the next step. Should you have an issue with a Kenfield product please call the team on 0121 451 3051.

Questions & Answers

Customer Questions
No Questions
Please login to ask a question

How to measure guide

  1. Measure the width of opening A
  2. Measure the height of opening B
  3. Check specifications for PVC/Overlap using “recommended use” in PVC specification table
  4. Specify whether the curtain will be for face or under lintel fixing.
  5. If in doubt, please check with us